APPLICATION AND SELECTION GUIDE

Corona Pretreatment Units: Workflow and Compatibility Checks

Evaluate machine compatibility, layout and production sequence for Corona Pretreatment Units. Review the information to prepare before selecting the equipment.

Corona Pretreatment Units: Workflow and Compatibility Checks

Evaluate surface pretreatment with a sample

Assess pretreatment requirements together with the product’s raw material and intended ink series. Define the area to be treated and how the product will be transported. Keep treated and untreated sample records separate.

Application values for this model

Technical recordHigh-frequency generator with IGBT system and power control (30.000Hz)
Technical recordKVA3 Unit: 380 Volt – 50Hz
Technical recordOil-filled transformer mounted separately from the KVA3 unit

What to include in the compatibility file

  • Full machine model code and connection configuration
  • External dimensions of the part or equipment
  • The equipment’s place in the production sequence and its relationship to the cycle
  • Required sample inspection results and operating conditions

How to compare quotations

Evaluate alternatives for Corona Pretreatment Units using the same sample and workflow. An individual unit appearing suitable does not establish that the entire line will meet the target cycle. Check loading, transport, cleaning, drying and other relevant steps in the actual production setup.

Let’s define the right printing setup for your product.

Tell us about the substrate, print size, number of colours and production target.

Quotes and Technical Support